Dredging of Lake Redwood has begun

Since early October 2021, a considerable amount of preparation has taken place for the dredging effort of Lake Redwood. Over 23,000 feet of black, 18-inch diameter pipeline has -been placed to transport to the dredged -material to the dewatering pond north of the city.